Every whole home remodel succeeds or fails in the planning stage. Before demolition began, we coordinated structural engineering, permits, and building systems across the entire home, the kitchen and living areas, primary suite, three bathrooms, the staircase, and the lower level, so each trade arrived to a ready, sequenced site. The three scope cards below summarize how the work was divided and completed.
Open-Concept Living Plan
Open Living & Kitchen
We removed dividing walls to create a seamless open-concept layout, backed by city-permitted structural engineering. The newly expanded footprint accommodates a custom kitchen with three architectural skylights, premium cabinetry, and a central waterfall island.
Primary Suite & Bathrooms
We reconfigured the layout to double the size of the primary bathroom, creating a luxury suite complete with a walk-in glass shower, freestanding soaking tub, and double vanity. All three bathrooms in the home were renovated at the same time to ensure uniform quality and waterproofing.
Staircase & Architectural Finishes
Solid oak treads and a custom frameless glass railing create a modern architectural focal point between floors. The remodel features engineered hardwood, durable luxury vinyl plank, a lower-level wet bar, and cohesive trim, drywall, and paint throughout the interior.
Before · Existing Conditions
The Home Before the Remodel
These existing-condition photos show the enclosed kitchen, the separated living and dining areas, the dated bathrooms, the carpeted staircase, and the tired lower level.
BeforeOld flooring and staircase
BeforeOld Entry Hall
BeforeOld living room
BeforeOld Kitchen Cabinetry
BeforeOld Dining Area
BeforeBathroom closets
BeforeOld Primary Vanity
BeforeOld Primary Shower
BeforeOld Primary Bedroom
BeforeOld Guest Bathroom
BeforeOld Staircase
BeforeOld Carpeted Staircase
BeforeOld Lower-Level Living Area
BeforeOld Lower-Floor Bathroom
Kitchen
Redesigning the Kitchen Flow & Living Space
BeforeOld Enclosed Kitchen
Before · Existing Kitchen
Open-Concept Kitchen Layout
The original kitchen layout was constrained by a central peninsula and two partition walls that separated it from the adjacent dining and living areas, restricting sightlines across the main floor and confining the room to a single workstation.
The new design removes the walls entirely, creating a unified, open floor plan that improves natural light distribution and establishes a seamless flow across the main level.
DuringDemolition & System Preparation
During · Demolition
Clearing the Old Layout
Demolition started as soon as permits were approved to keep everything on schedule. Removing the old cabinets, flooring, and dividing walls completely opened up the main level and exposed the framing underneath.
Having full access to the frame allowed our team to prep the ceiling for three new skylights and cleanly route upgraded electrical, plumbing, and gas lines before closing up the walls.
DuringStructural & Utility Work
During · Structural Systems
Framing & Utility Rough-Ins
With the space cleared, the crew framed the openings for three new skylights and prepped the walls for final finishing.
At the same time, electricians, plumbers, and gas fitters ran all upgraded wiring and supply lines through the open structure ensuring every utility update was fully inspected and approved before closing the walls with new drywall.
DuringFraming, Rough-Ins & Drywall
During · Rebuild
Preparing for the Finish Work
Once rough-in inspections were approved, the team installed subflooring, insulation, and drywall to seal the space and form the shell of the new kitchen.
Drywall taping, texturing, and priming followed, creating a clean, level surface for cabinet installation. From this stage forward, the space transformed rapidly.
Completed Open-Concept Kitchen
After · Completion
The Completed Kitchen
The finished space brings every design detail together into a cohesive, functional layout. Flat-panel cabinetry spans wall to wall, seamlessly integrating the refrigerator, oven, and pantry to form a clean, continuous line along the main wall. At the center, a waterfall quartz island anchors the room, establishing the open gathering space that the original layout lacked.
Above, three skylights flood the island with natural light, brightening the seamless connections into the adjacent dining and living areas. High-traffic quartz countertops and durable hardwood flooring complete the space, selected specifically to balance refined aesthetic design with everyday durability.
Kitchen Remodel Gallery
The finished kitchen, from the completed open-concept reveal to detail views of the cabinetry, island, skylights, and the new connections to the dining and living rooms.
Open-Concept Kitchen
Flat-Panel Cabinetry & Island
Integrated Appliance Wall
Cooktop & Integrated Hood
Skylit Open-Concept Kitchen
Engineered Hardwood Flooring
Island Beneath Three Skylights
Kitchen & Dining Connection
Full Kitchen Reveal
Kitchen from the Dining Area
Waterfall Island Detail
Integrated Oven Cabinetry
Architectural Detail · Skylights
Self-Flashing Skylights
Self-Flashing Skylights
To maximize natural light throughout the open space, we framed and installed three 24" x 48" skylights featuring an advanced self-flashing system that completely eliminates the need for bulky, raised curb frames. Unlike older models that sit high above the roofline and disrupt the home's exterior profile, these units sit low and flush against the roof for a clean, architectural finish.
The surrounding shingles were meticulously matched and integrated to guarantee a flawless, leak-tight seal against the elements. This precision craftsmanship enhances the home's curb appeal while flooding the new kitchen layout with effortless overhead sunlight.
Primary Suite
Primary Suite · Plan & Scope
Before PlanOld Bathroom Layout
Remodel PlanProposed Bathroom Layout
From the Old Layout to the New Suite
We demolished existing interior partition walls and closets to transform the layout into an open-concept primary bath retreat. To optimize flow, we relocated the bathroom’s entrance, installed a stylish sliding barn door, and built a brand-new closet for the bedroom with doors color-matched to the rest of the home.
Inside the bath, the design features an expanded walk-in shower, a freestanding soaking tub positioned on the left, and an expanded double-sink vanity along the main wall. Complete with fully upgraded plumbing, electrical, fixtures, tile, flooring, lighting, and elevated wall finishes, this comprehensive remodel delivers a seamless blend of tailored storage, functionality, and refined luxury.
Primary Suite Remodel Gallery
Explore the complete primary suite transformation and detail highlights in the gallery below.
Open-Concept Primary Bathroom
Reworked Primary Suite
Frameless Glass Walk-In Shower
Freestanding Soaking Tub
Bathroom & Bedroom Flow
Primary Bedroom & New Closet
Walk-In Shower Fixtures
Tiled Shower Floor
Recessed Shower Niche
Lower-Floor Bathroom
Rebuilding the Lower-Floor Bathroom
The lower-level bath required a complete structural rebuild. Demolition revealed compromised framing, requiring slab cutting for relocated plumbing and a fully waterproofed reconstruction. Below is the construction sequence.
BeforeOld Lower-Floor Bathroom
Before · Existing Bathroom
Basement Bathroom Transformation
Prior to the renovation, this basement bathroom featured an outdated, restrictive layout compromised by poorly positioned fixtures, a compact shower enclosure, and a heavy dividing wall that obstructed light and underutilized the available footprint.
To create an open, high-end feel, we completely overhauled the layout from the ground up. We removed the dividing wall to maximize the footprint, reconfigured the underground plumbing for a far better layout, and replaced the old shower with a spacious custom tile walk-in featuring a frameless glass surround. Finished with a sleek floating vanity, updated lighting, and clean tile work, the space now feels bright, airy, and modern.
DuringDemolition & Structural Remediation
During · Demolition
Foundational Restoration & Rough-Ins
Full-scale demolition down to the slab uncovered hidden moisture damage caused by the previous shower installation. Clearing the space entirely allowed us to address structural integrity before moving forward with plumbing layout, insulation, substrate prep, and waterproofing membranes.
Rather than patching over compromised materials, we removed all rotted framing, installed fresh structural lumber, and integrated updated rough plumbing with a continuous moisture protection system. The resulting build provides a solid, long-lasting foundation for the finished tilework.
DuringUnderground Plumbing
During · Underground Plumbing
New Drainage Below the Slab
Opening the slab allowed us to trench and replace the underground drainage and vent lines. This below-grade work is completely hidden behind the finished walls and floors, but it’s what makes relocating the toilet, vanity, and expanded shower drain possible.
Every pipe run was set to code-compliant slope, pressure-tested, and officially inspected before we backfilled the trench and poured concrete. By completing the trenching efficiently in a single pass, we kept the project on schedule and created a perfectly level, solid base for the new floor.
DuringInsulation, Substrate & Waterproofing
During · Waterproofing
Waterproofed and Ready for Tile
Rebuilding followed a strict, methodical sequence: wall insulation, cement backer board across all wet surfaces, and a continuous waterproofing membrane spanning the entire shower enclosure and floor. This waterproofing stage is the single most critical checkpoint in the project, it is precisely where shortcuts lead to premature failure in lesser builds.
Before laying a single tile, we flood-tested the shower pan, inspected every seam and fastener penetration, and fully documented the assembly for the homeowner. While meticulous waterproofing requires extra time upfront, it ensures the shower remains completely watertight for decades to come.
Completed Lower-Floor Bathroom
After · Completion
A Finished Room on a Rebuilt Floor
The completed remodel seamlessly blends clean lines with modern functionality. The new design features a spacious walk-in shower with large-format wall tiles, a mosaic floor, a recessed storage niche, and a frameless glass panel.
A rich walnut floating vanity with a quartz top maximizes floor space, complemented by modern chrome hardware, updated vanity lighting, and crisp contemporary details throughout.
Across the Home · Finished Spaces
The Details That Complete the Remodel
This section highlights the remaining updates: a full hall bath renovation, a rebuilt oak and glass staircase, unified upper-level flooring, and a new lower-level wetbar with LVP floors.
Finished Guest Bath
Guest Bath Niche & Fixtures
Custom Staircase
Wood Stair Treads & Handrail
Finished Stair Landing
Lower-Level Kitchenette
Lower-Level LVP Flooring
Stair Railing & Upper-Level Flooring
Final Gallery · Whole Home
The Completed Bellevue Home
One last gallery gathers the whole project together, the kitchen, the Primary Suite, three bathrooms, the staircase, and the lower level, so you can see how one coordinated remodel made every room feel part of the same home. Filter by area, or click any photo to view it full size.
Most whole home remodels run 4 to 8 months from planning to completion. The timeline depends on the scope, permit review times, and how many rooms are involved. On this project, engineering, permits, and sequencing were completed before demolition began, which kept construction moving without waiting on approvals.
Yes. We coordinate structural engineering, permit applications, and all required inspections with the City of Bellevue and surrounding jurisdictions. Structural wall removals, plumbing relocations, and skylight installations are engineered and permitted before construction starts.
Many homeowners do. We sequence the work so key spaces stay usable as long as possible, contain dust at the source, and keep walkways safe. For whole home projects that touch every level, we will walk through the daily realities with you at the consultation so you can decide what works best for your household.
Whole home remodels in Bellevue and on the Eastside typically range from $150,000 to $500,000+ depending on square footage, structural work, and finish level. The largest variables are structural changes, kitchen and bathroom scope, and window or skylight work. We build a clear, line-item estimate before construction begins. Actual project costs vary depending on the size of the space, structural or layout changes, plumbing and electrical upgrades, permit requirements, and material or finish selections. Contact us for a detailed, customized estimate tailored to your home and project goals.
We serve Bellevue and the greater Eastside, including Medina, Clyde Hill, Kirkland, Redmond, Sammamish, Mercer Island, Newcastle, and Issaquah. If you are nearby and do not see your city listed, reach out and we will confirm whether we can take on your project.
General Contractor in Bellevue and surrounding communities
Planning a Whole Home Remodel in Bellevue?
If your home feels as boxed-in as this Bellevue kitchen did, the same planning-first process of engineering, permits, and sequencing before demolition can open it up. Contact our team to talk through your whole-home remodeling project with a general contractor serving Bellevue and the Eastside.
Luxe Remodeling LLC is a licensed general contractor serving homeowners across Bellevue and the surrounding Eastside communities. From whole home remodels to kitchens, bathrooms, and additions, we bring the same planning-first process to every city we work in.
Luxe Remodeling provides full-home, kitchen, and bathroom remodeling services across the Eastside and Greater Seattle Area, bringing the same craftsmanship and care to every neighborhood we work in.
Bellevue
Kirkland
Redmond
Sammamish
Woodinville
Bothell
Issaquah
Mercer Island
Renton
Snohomish
Greater Seattle Area
Don't see your city listed? Get in touch — we regularly take on projects throughout the region.