Whole Home Remodel in Bellevue, WA

This Bellevue remodel reworked the home as one connected project, opening the kitchen and living areas, bringing daylight through three skylights, reshaping the Primary Suite, and updating bathrooms, stairs, flooring, and the lower level.

Open-Concept LivingSkylit KitchenPrimary SuiteBathrooms & Lower Level
After
01

Project Plan & Scope

One Plan for a More Connected Home

For this whole home remodel in Bellevue, we will coordinate structural work, building systems, and interior finishes across the kitchen, living areas, Primary Suite, bathrooms, staircase, and lower level.

Open Living & Structural Planning

We will remove the dividing walls between the kitchen, dining room, and living room to establish a more natural main-floor flow, with engineered shear walls and permit planning supporting the new open layout.

Kitchen & Natural Light

We will plan the expanded kitchen together with upgraded electrical, plumbing, and gas lines. Three 24-by-48-inch skylights will bring daylight over the new cabinetry, island, and connected gathering spaces.

Primary Suite & Bathrooms

We will remove closets and interior partitions to make room for an expanded Primary Bathroom with a walk-in shower, freestanding soaking tub, and double vanity. The bedroom will gain new storage and privacy, while the guest and lower-floor bathrooms receive their own layout and finish updates.

Flooring, Staircase & Finishes

We will run engineered hardwood through the main living areas and durable LVP through the lower level. A custom staircase and handrails, along with repaired drywall, wall texture, and paint, will complete the interior.

02

Before · Existing Conditions

The Home Before the Remodel

These photographs establish how the rooms related before work began, from the enclosed main-floor kitchen and living areas to the Primary Suite, bathrooms, staircase, and lower level.

03

Room 1 · Kitchen

Opening the Kitchen to the Main Floor

The kitchen renovation brought the structural plan, utility upgrades, skylight preparation, custom cabinetry, and finish work into one continuous room story.

The Completed Kitchen

The finish work brings the open layout, natural light, storage, appliances, and durable surfaces together.

After · Completion

Built Around Light and Flow

Flat-panel cabinetry and integrated appliances frame a waterfall quartz island at the center of the room. Engineered hardwood continues into the adjoining spaces, while the skylights bring daylight across the kitchen and its newly open connections.

04

Architectural Detail · Skylights

Natural Light From Above

Three skylights complete the open main-floor plan, bringing daylight over the kitchen while keeping a clean, low-profile appearance at the roof.

Designed as Part of the Kitchen Structure

The roof openings were coordinated while the kitchen framing and insulation were exposed. That early planning allowed the skylights to become part of the room rather than a finish added after the interior was complete.

Low-Profile Skylight Installation

The finished roof view shows the three self-flashing units and the repaired shingles around them.

A Cleaner Roofline

The self-flashing skylights sit close to the roof plane without bulky curb frames. Once they were installed, the surrounding shingles were repaired and matched to leave a clean transition across the roof.

05

Room 2 · Primary Suite

Reworking the Primary Suite

The primary suite renovation improved the layout, storage, and privacy of the adjoining bedroom and bathroom.

More Space, Storage, and Privacy

Removing the old closets and partition walls opened room for an expanded walk-in shower, freestanding soaking tub, and double vanity. The bathroom entrance shifted to a sliding door, while a new bedroom closet and full privacy wall completed the suite.

Primary Suite · Plan & Scope

The drawings show how the old bathroom related to the proposed layout before construction began.

From the Old Layout to the New Suite

The plan removed interior partitions and closets so the Primary Bathroom could expand. Plumbing and electrical work shifted with the new shower, soaking tub, and double vanity, while new flooring, tile, lighting, and wall finishes carried the design through to completion. In the bedroom, the work added a 2-by-10-foot closet and enclosed the former half-wall for greater privacy.

Primary Suite · Before & After

The old closets came out to make room for the expanded bathroom, and the completed views show the new connection between the Primary Bathroom and bedroom.

The Previous Layout in Detail

These Before views document the old closets, vanity, shower, and bedroom wall configuration.

Completed Primary Suite Gallery

The finished gallery shows the walk-in shower, soaking tub, tile details, bedroom, and custom wood closet.

06

Room 3 · Lower-Floor Bathroom

Rebuilding the Lower-Floor Bathroom

This compact room required more than a finish update. The old layout, damaged framing, underground plumbing, waterproofing, and completed bathroom are shown together in construction order.

A New Layout From the Slab Up

The corner toilet, partition wall, and small shower enclosure limited the old bathroom. The redesign removed the divider, relocated the toilet, added a floating vanity, expanded the shower, and renewed the plumbing and electrical systems around the new arrangement.

Lower-Floor Bathroom · Before

Making Better Use of a Small Room

Moving the fixtures made it possible to give the shower more space and place a floating vanity where the toilet had been. Because the new layout affected services below the floor, the work continued through the concrete slab as well as the walls.

Construction & Waterproofing

Demolition exposed the damaged framing and created access for drainage, new services, insulation, substrate, and waterproofing.

Lower-Floor Bathroom · After

The final view shows how the relocated layout and careful rebuild translate into a brighter, more useful room.

After · Completion

Clean Finishes, Better Function

A floating quartz-top vanity keeps the floor visually open beside the custom tiled shower. Frameless glass, a recessed niche, updated lighting, and contemporary fixtures finish the rebuilt lower-floor bathroom.

07

Across the Home · Finished Spaces

The Details That Complete the Remodel

The guest bathroom, staircase, railings, lower-level kitchenette, and new flooring carry the same considered finish language beyond the project’s three main room stories.

A Cohesive Finish From Level to Level

The custom staircase links the renovated floors, while engineered hardwood and lower-level LVP give each area a durable foundation. Updated bathroom surfaces, new railings, and the lower-level kitchenette extend the remodel through the rest of the home.

Guest Bathroom · Before & After

The dated green-tile tub surround became a large-format tile alcove with a rain showerhead and a lit back panel.

Staircase · Before & After

The carpeted run with its wood slat railing is now solid oak treads behind a frameless glass balustrade with a walnut handrail.

Other Remodeled Spaces

General Contractor in Bellevue

Planning a Whole Home Remodel in Bellevue?

Discuss your plans with a general contractor in Bellevue. Contact our team to talk through your whole-home remodeling project.

Discuss Your Project