A room-by-room look at how a compartmentalized Kirkland home became a more open and connected place to live.
Project Plan & Scope
One Coordinated Plan for the Entire Home
This whole home remodel in Kirkland, WA, began with one coordinated plan for structural alterations, floor plan layout redesign, utility upgrades, custom interior finishes, and exterior repairs. The plan connected the relocated kitchen and expanded entry foyer with three fully renovated custom bathrooms, two modern gas fireplaces, new premium flooring, custom staircase improvements, high-efficiency replacement doors, designer lighting fixtures, and a rebuilt outdoor deck.
ScopeStructural Plan & Scope of WorkMain Floor Plan
Design & Structural Work
Interior design, structural engineering, and permit planning established the sequence. We removed the marked kitchen and hallway walls and replaced them with the planned beam and posts. Relocating the kitchen also required raising the dining-room window sill, flattening the dropped ceiling, and opening the entrance by removing the closet and unused framed space.
Systems & Major Rooms
Opening the plan created access for new plumbing and electrical work, an upgraded main panel, and revised gas piping for the kitchen and fireplaces. We then rebuilt the primary bathroom, secondary bathroom, and powder room as part of the same coordinated renovation.
Flooring & Interior Finishes
We used LVP flooring to tie together the main and lower floors, while carpet softened the second level. New cabinetry and countertops were coordinated with drywall repairs, wall texture, paint, and updated lighting so the rooms share one consistent finish language.
Carpentry, Doors & Deck
We replaced the staircase pony wall with an open rail featuring a custom wood handrail, black metal balusters, and matching newel posts. Interior and exterior doors were replaced, and we repaired damaged deck framing before installing new composite decking, rebuilt stairs, and black aluminum railings.
Before · Existing Conditions
The Home Before the Remodel
BeforeOld Entry Hall
BeforeEntry Hall & Storage
BeforeLower-Level Room
BeforeOld Main Living Room
BeforeLiving & Dining Connection
BeforeOld Living-Room Fireplace
BeforeOld Kitchen Layout
BeforeOld Kitchen Island
BeforeOld Cabinet Wall
BeforeOld Staircase
BeforeOld Primary Bathroom
BeforeOld Shower Stall
BeforeOld Double Vanity
BeforeOld Secondary Bathroom
BeforeLower-Level Exterior Doors
BeforeOld Walk-In Closet
BeforeInterior Hallway
BeforeLower-Level Landing
BeforeLower-Level Stair Hall
BeforeOld Lower-Level Family Room
Room 1 · Kitchen
Open-Concept Kitchen Remodel Construction
BeforeOld Enclosed Kitchen and Dinning Area
Before · Existing Kitchen
The Original Enclosed Kitchen
The kitchen occupied a closed-off footprint behind enclosing walls and a lowered ceiling. Those boundaries restricted daylight, shortened the view through the main floor, and kept cooking activity apart from the adjoining living spaces.
The remodel relocated the kitchen to the former dining area, raised the window sill to provide counter clearance, and planned a wider connection to the living room. That new arrangement required the structure, utilities, cabinetry, and finishes to be redesigned as one coordinated sequence.
DuringStructural Wall Removal
During · Structural Demolition
Opening the Main Floor Safely
Demolition began with the cabinetry, dropped ceiling, and designated walls. Temporary framing carried the load during this phase so the old divisions could come out without interrupting the structure above.
Once the opening was clear, the permanent engineered beam and posts were installed. Old plumbing and electrical lines were removed or redirected at the same time, allowing the kitchen services to follow the relocated plan instead of the original footprint.
DuringThe Open Layout Takes Shape
During · Rebuild
A Clean Shell for the New Kitchen
With the structural opening complete, plumbing, gas, and electrical rough-ins were coordinated through the new footprint. The window sill was raised so the future counter run could continue beneath it without losing the connection to the garden.
Drywall repairs, ceiling work, texture, paint, and flooring then brought the separate construction zones back into one finished shell. This sequencing left accurate surfaces and service locations ready for cabinetry, countertops, and appliances.
Kitchen & Living-Space Connection
After · Completion
The Finish Work Brings the Plan Together
Custom dark wood cabinetry, stone work surfaces, integrated appliances, and final utility connections completed the relocated kitchen. The island creates a generous work surface and a clear transition between the cooking area and the rest of the main floor.
Seen from the living room, the finished kitchen no longer reads as a separate enclosed room. Continuous flooring, aligned finishes, and the nearby linear fireplace visually connect the spaces while preserving distinct places to cook, gather, and relax.
Completed Kitchen Gallery
The finished views move from the island and garden connection to the waterfall edge, integrated workspace, cooking wall, and continuous stone surfaces.
Island & Garden View
Waterfall-Edge Island
Integrated Kitchen Workspace
Cooking Wall & Stone Surfaces
Fireplaces
Two Modern Gas Fireplaces
BeforeOld Wood-Burning Fireplace
Main-Floor Linear Fireplace
Main Floor · Living Room
Fireplace Conversion
The old living-room hearth becomes the main-floor linear gas fireplace: the dated wood-burning firebox and surround were removed, the gas line was extended during the utility rough-in, and a clean-lined linear burner set into large-format porcelain tile now anchors the opened living space.
The before-and-after pair shows how the swap turned a dated corner feature into the focal point of the new great room, with wiring planned above the tile for the finished wall.
One of two outdated wood-burning fireplaces removed during the gas system upgrade, this clean-lined model was integrated into the newly opened living space, and its piping, venting, and surround were sequenced with the structural opening so both hearths share one built-in look.
Before
Before photo coming soonThe lower-level family room before its gas fireplace was installed.
Lower-Level Family Room · Before
Lower-Floor Fireplace
Lower Level · Family Room
Lower-Level Fireplace Remodel
Built as the second unit in a two-floor plan, this gas fireplace anchors the family room with the same clean-lined surround and tile as the main-floor fireplace, giving both levels one consistent, built-in look.
Gas lines and venting were installed during the mechanical work, and the surround, tile, and paint were completed alongside the new flooring. Recessed lighting and hidden wiring above the fireplace make room for a TV setup while keeping the view from the stairs clear.
Foyer
Opening the Entrance
BeforeOld Narrow Foyer
Expanded Entry Hall
A narrow arrival with bulky storage became a wider entry that shares light and longer sightlines with the renovated main floor. Removing the entrance closet, the surrounding non-structural walls, and the unused framed space widened the first view into the home.
New flooring, fresh paint, and a front door with frosted glass panels completed an entry that feels brighter without sacrificing privacy. The paired views show the same arrival point before and after construction: the revised opening, continuous flooring, and frosted-glass door make the transition into the home feel broader and brighter while retaining privacy at the street-facing entrance.
Completed Foyer Gallery
Widened Foyer Opening
Frosted-Glass Front Door
Open Foyer Sightline
Primary Bathroom
Primary Bathroom Remodel
BeforeThe Original Room
Before · Original Condition
Existing Layout Limitations
The original plan divided the room with a partition wall, a drop-in tub, and an undersized shower enclosure inside a constrained footprint.
The partition interrupted both sightlines and movement, while the bulky tub consumed floor area that could not be shared with the undersized shower.
A successful redesign needed to recover that wasted space, straighten the shared wall, and address the damaged floor below. Those changes established a sound footprint before any new fixtures were selected.
DuringConstruction in Progress
During · Construction
Opening the Footprint
The partition wall was removed, the shared closet wall was straightened, and water-damaged subfloor was replaced before new plumbing, electrical, and ventilation rough-ins.
Removing the partition revealed one continuous room and made it possible to correct the closet line. The damaged subfloor was replaced so the new bathroom would begin on a stable base.
Plumbing, electrical, and ventilation rough-ins were then coordinated with the freestanding tub, shower, vanity, and lighting locations. Completing that work in the open shell prevented the old layout from dictating the new one.
AfterThe Final Reveal
After · Completed Result
Open, Calm, and Sunlit
The finished bathroom pairs a freestanding tub and frameless shower with a fluted vanity, tiled niche, and natural light throughout the opened footprint.
The freestanding tub and frameless shower now share the opened footprint without dividing it again. A tiled niche adds shower storage while keeping the enclosure visually clean.
The fluted wood vanity warms the surfaces, and restrained black details give the room definition. Natural light can move across the full space, reinforcing the calmer and more generous layout.
Completed Project · Gallery
The finished primary bathroom — the freestanding tub, fluted-wood vanity, frameless shower, recessed niche, floor-to-ceiling tile, and repeated mosaic details.
Freestanding Soaking Tub
Custom Fluted-Wood Vanity
Frameless Walk-In Shower
Floor-to-Ceiling Shower Tile
Mosaic Shower Floor
Recessed Shower Niche
Glass & Mosaic Shower Detail
Hexagon Mosaic Accent Wall
Vanity & Soaking Tub
Other Remodeled Spaces
Finishing the Rest of the Home
New flooring, open stair rails, fresh finishes, replacement doors, and deck repairs tie the supporting rooms together so the entire home feels unified. The photos highlight the finished secondary spaces and exterior work across the property.
Finished Secondary Bathroom
Built-In Bathroom Niche
Composite Deck & Railings
Rebuilt Deck Stairs
BeforeOld Staircase
Open Staircase
Custom Stair Rail
Wood Handrail & Metal Balusters
Bright Finished Bedroom
Finished Bedroom & Closet
Refinished Upper Landing
Walk-In Closet
Lower-Level Living Space
Modern Powder Room
New Interior Doors
Final Gallery · Whole Home
The Completed Kirkland Home
A final curated gallery brings together the kitchen, fireplaces, foyer, Primary Bathroom, secondary bathroom, deck, staircase, lower level, and powder room.
Answers to the questions homeowners ask most about planning a whole home remodel in Kirkland, from timeline and budget to permits and living through construction.
Most whole home remodels run 4 to 8 months from planning to completion. The timeline depends on the scope, permit review times, and how many rooms are involved. On this Kirkland project, engineering, permits, and sequencing were completed before demolition began, which kept construction moving without waiting on approvals.
Whole home remodels in Kirkland and on the Eastside typically range from $150,000 to $500,000+ depending on square footage, structural work, and finish level. The largest variables are structural changes, kitchen and bathroom scope, and flooring or window work. We build a clear, line-item estimate before construction begins. Actual project costs vary depending on the size of the space, structural or layout changes, plumbing and electrical upgrades, permit requirements, and material or finish selections. Contact us for a detailed, customized estimate tailored to your home and project goals.
Yes. We coordinate structural engineering, permit applications, and all required inspections with the City of Kirkland and surrounding jurisdictions. Structural wall removals, plumbing relocations, fireplace conversions, and utility upgrades are engineered and permitted before construction starts.
Many homeowners do. We sequence the work so key spaces stay usable as long as possible, contain dust at the source, and keep walkways safe. For whole home projects that touch every level, we will walk through the daily realities with you at the consultation so you can decide what works best for your household.
A full home remodel can include floor plan changes and structural wall removal, kitchen and bathroom renovations, new flooring, doors, lighting, and fireplaces, plus exterior work like decks. On this project, one coordinated plan covered the relocated kitchen, three bathrooms, two gas fireplaces, the expanded foyer, staircase, and rebuilt deck.
We serve Kirkland and the greater Eastside, including Bellevue, Medina, Clyde Hill, Redmond, Sammamish, Mercer Island, Newcastle, and Issaquah. If you are nearby and do not see your city listed, reach out and we will confirm whether we can take on your project.
General Contractor in Kirkland
Planning a Full Home Remodel in Kirkland?
Discuss your plans with a general contractor in Kirkland. Contact our team to talk through your whole-home remodeling project.
Luxe Remodeling provides full-home, kitchen, and bathroom remodeling services across the Eastside and Greater Seattle Area, bringing the same craftsmanship and care to every neighborhood we work in.
Bellevue
Kirkland
Redmond
Sammamish
Woodinville
Bothell
Issaquah
Mercer Island
Renton
Snohomish
Greater Seattle Area
Don't see your city listed? Get in touch — we regularly take on projects throughout the region.